CIM, 3D Model, Data/Analytics, Technology Sally Benninger CIM, 3D Model, Data/Analytics, Technology Sally Benninger

HOW TO MEASURE THE ROI OF CIM

By bringing together virtual models, data analytics, systems, people, and improved workflows through CIM you will gain efficiencies in every phase. Stakeholders will be able to easily access and rely on accurate and timely information which will enable them to do their jobs better. Your projects will not run behind schedule as often and your overall costs will decrease.

Read More
3D Model, CIM, Cut and Fill, Technology Sally Benninger 3D Model, CIM, Cut and Fill, Technology Sally Benninger

3 EASY STEPS TO WORKING WITH A GPS MACHINE CONTROL DATA PROVIDER

So, you’ve invested in some GPS machine control technology. You’ve weighed the option of training or hiring an in-house person versus hiring an external service provider to handle the data prep. Based on your research, you’ve decided to partner with an external company that specializes in data prep and want to know what the next steps are.

Read More
3D Model, CIM, Data/Analytics, Technology Sally Benninger 3D Model, CIM, Data/Analytics, Technology Sally Benninger

PROJECT TURNAROUND: PROBLEMS THAT AFFECT SPEED AND HOW TO AVOID THEM

A question we are frequently asked by our clients and prospective clients is “What is the turnaround time for this project?”. Generally speaking, we typically run on average with a two-week turnaround time but situations sometimes impact that timeline which means it could take longer. Let’s go over some problems that impact the speed of model building.

Read More
3D Model, Technology, CIM Sally Benninger 3D Model, Technology, CIM Sally Benninger

UNDERSTANDING THE COST OF A 3D ROAD MODEL: FACTORS THAT IMPACT PRICE

The increased use of GPS systems for construction projects has led to contractors often asking themselves or service providers like us, “What does a 3d road model cost?”. Typically, you’ll hear the standard reply of “it depends” which it does. However, we’re going to explain why it depends and what each type might generally cost.

Read More
3D Model, Technology Sally Benninger 3D Model, Technology Sally Benninger

BULLDOZERS: ALL YOU SHOULD KNOW ABOUT THEM AND HOW GPS IMPROVED THEM

For GPS to work successfully and efficiently in earthwork, there must be accurate 3D models loaded into the dozer or other heavy machinery. GPS has become more of the industry standard, and we expect there will not be many site contractors running projects without GPS on their equipment. The benefits are far too great not to make the switch.

Read More
Technology Guest User Technology Guest User

HOW BEST TO DEPLOY BASE STATIONS AND VIRTUAL REFERENCE STATIONS

Land surveyors have been using GPS receivers at a known position, called base stations, for a long time, and that method continues to be effective and used a lot. However, there's also the option of using a virtual reference station (VRS) instead of a base station. A VRS is a technique for network RTK for GPS systems. How do you choose between a base station and a VRS? Well, there are pluses and minuses with each system, so it depends.

Read More
CIM, Technology Guest User CIM, Technology Guest User

THE IMPORTANCE OF COMPLYING WITH ADA IN CONSTRUCTION AND HOW ECI HELPS

The American Disabilities Act of 1990 (ADA) is one of the most important considerations that must be factored into all construction projects, whether new construction or renovation. Numerous ADA guidelines must be followed when constructing, for example, sidewalks, ramps, parking spaces, or buildings. Not following them will result in hefty fines, which can reach as high as $150,000 depending on the number of violations.

Read More